The Local Planning Authority raised concerns associated with infilled historical brick pits and potential for contamination beneath the house and in the local vicinity. The Local Planning Authority argued that constructing the basement might disturb infilled materials posing a risk to users of the extension and required a Phase 1 contamination assessment.
Our approach
Our Phase 1 assessment included a thorough review of historical mapping which established a low likelihood of infilling beneath the property.